About us
Key Executives

Group Companies

Innovations

Patents

Collaboration
Transparent News
Career
Contact us

   
Services   

      Conceptualization Stage

  • The biomass will be analyzed for its composition and concentration of organic dry matter with the help of accurate and sensitive analytical techniques.
  • Methodology of gasification will be proposed on the basis of analytical examination with know how from B3.
  • The proposed process for fermentation of the analyzed biomass will be established after pilot plant trials using our facilities.
  • Based on this detailed facility planning report will be made.

      Engineering Stage

  • The detailed design parameters of the established process will be set depending on the results of pilot plant trials

  • Each of the equipment in the process of the gasification of the biomass will be engineered by TESPL.

  • Based on this detailed engineering report will be prepared.

 

      Coordination Stage

  • Assistance will be provided for the pre-dispatch activities like man power, space, infra structure and foundation.

      Inspection Stage

  • The equipments will be inspected to meet the specifications

  • Performance tests will be conducted

  • Witnessing and certification of inspection of site activities

  • Witnessing and certification of pre-commissioning inspection and certification

 
  • Inspection and verification of documentation

  • Witnessing and certification of final commissioning and performance proving or originally projected results.

   
      Documentation
  • Layout
  • O & M Manuals
  • Test Certificates
  • Recommended stand by and spare parts list
  • Performance Certificates
  • Warrantee
  • I/P-O/P parameters
  • Purity parameters of the reagents and chemicals used
  • Chemical handling practices guide and MSDS.
  • P & I Diagram
  • Instructions on emergency shut downs, cleaning procedures and general safety.

Commissioning Stage:

  • Documentation of the entire commissioning activity

  • Client training on O & M care, trouble shooting, documentation referencing and spare parts importance.

 

 
       Bioenergy         Enquiry Forms
        Utilization of Biomass No.1
       
    

 

Designed and maintained by Transparent Energy Systems Pvt. Ltd.